QC Hold and Release Tracking for Quality Teams
Track quality holds from hold to release: inspection, disposition with rework or scrap branches, and time-in-hold measured for every batch.
Without a system
A batch is on hold pending inspection. The inspection happens, but the release decision lives in someone's head until they get around to updating the tracker. Meanwhile the batch sits, and no one downstream knows why.
With Cesflo
Hold, inspection, disposition, and release are explicit stages. A failed disposition can branch the process into rework or scrap instead of forcing everything through the same path. Anyone downstream can see, in real time, exactly which stage a batch is in and why it hasn't moved.
The process, step by step
- 1
Hold
Batch placed on hold with the reason.
- 2
Inspection
QC inspects and records results.
- 3
Disposition
Decision: release, rework or scrap (branches).
- 4
Release
Authorized release signed off; time-in-hold recorded.
Time-in-hold becomes a measured, trended number instead of an invisible cost. A stage that's habitually a bottleneck stops hiding in someone's inbox and starts showing up in the data.
Frequently asked questions
Can the process branch for rework or scrap?
Yes. A decision stage routes the run down a different path depending on the outcome.